After a bit of a rough start, they watered the concrete down a bit and got to pouring. I'd have rather them pour drier and work it, but the contractor likes it easy. The first truck pretty much did all the footers.
Description: After a bit of a rough start, they watered the concrete down a bit and got to pouring. I'd have rather them pour drier and work it, but the contractor likes it easy. The first truck pretty much did all the footers.
File name: 20120113-215 Day 4 - First Concrete Truck Pour.jpg